POWER EVACUATION
The electric power from the first two GT generators and corresponding ST generator will be evacuated using step-up transformers to the new air-insulated 132kV substation “AZIKEL 1.” That substation will be connected with the 132kV “YENAGOA 1” substation through a 3km-long double-circuit overhead line. The plant’s auxiliaries will be fed from a 2-unit auxiliary transformer. Black start will use energy from an emergency diesel generator.
Power generated from the 9E machines and STs (Phase 2 – 3) will be evacuated through step-up transformers to the new air-insulated 330kV substation “AZIKEL 3.” The substation will be connected with a future 330kV overhead double power line “ONNE-DELTA IV.”