OUR TECHNOLOGY

The Power Plant Phase 1 and 2 is a Gas Turbine Options. The Gas Turbine shall be a high-duty unit, single shaft with inline compressor and directly coupled generation, equipped with advanced combustor and characterised by high reliability efficiency. Available Gas turbine are as follows:

  1. Phase 1: 35-45MWe
  2. Phase 2: 115-135MWe

The Power Plant Phase 1 and Phase 2 utilize a gas turbine option. The gas turbine will be a heavy-duty unit, single shaft, with inline compressor and direct-coupled generation. It will be equipped with an advanced combustor and will be characterized by high-reliability efficiency. The available gas turbine is as follows:

Phase 1: 35-45MWe

Phase 2: 115-135MWe

The power plant, in its final design, will consist of multi-shaft units. The units will be based on two heavy-duty gas turbine generators and auxiliary facilities in a 2+2+1 configuration. The plant configuration will be based on technical standard solutions designed by the future contractor to meet requirements of the company and project specification.

Phase 3 will be built as a combined circle, which will primarily use steam to generate the desired power balance.